In Szczecin, the old bridge structure has already been demolished on the Cłowy Bridge construction site. Currently, preparations are underway for the excavation of abutments. The work is being carried out by a consortium of Vistal Gdynia S.A. and Vistal Infrastructure Sp. z o.o.