On the 23rd of December this year, the launching of a hull of a specialist vessel manufactured by Vistal CG and produced for the purpose of offshore wind farms took place. The vessel, 120 m long and 32 m wide, will be equipped with cable laying equipment and will also serve as a logistic base for offshore wind farm installation works in the North Sea.