Last year, we carried out the largest contract for the offshore market to date on behalf of Aibel. Within 8 months, we manufactured more than 3,000 tonnes of structures to the highest world standard, as required by the conditions of use of oil rigs in the North Sea. All sections were subjected to an anti-corrosion protection process. More than 40,000 m2 of structures were painted. For loading the finished modules, essentially all methods available in the industry were used, i.e. self-propelled platforms, floating cranes and hydraulic slides.